LED Panel Replacement on Elevated or Rigged Displays: Planning and Coordination Guide
A guide for coordinating panel replacements on rigged or elevated LED displays, including scheduling, access, and timing considerations.
Overview Some Aurora LED installations are mounted at height and require professional riggers or elevated work platform (EWP) operators to access panels for replacement or repair. This article outlines the key steps for planning and coordinating these works safely and efficiently. When Is Rigging Required? The display is suspended from a ceiling, truss, or overhead structure Panels are not accessible from ground level or a standard ladder The installation is at a venue where working at height regulations apply (e.g. stadiums, arenas, large event spaces) Planning Checklist Identify the fault: Confirm which panel or panels require replacement before scheduling access, to minimise time on the rig. Organise rigging access: Coordinate with the venue's rigging contractor or facilities manager to schedule a suitable access window. Confirm load ratings and rigging methodology with the contractor. Check the event calendar: Avoid scheduling works during events, game days, or member days. Confirm the next key dates with the venue before booking. Arrange replacement parts in advance: Ensure the correct replacement panels, data cables, and any other required components are on-site before the rigging crew is engaged. Confirm crew requirements: Determine how many technicians are needed on the rig versus on the ground (e.g. one technician to handle the panel, one to operate control software and verify output). Test after replacement: Once the panel is installed, verify operation from the control system before the rig is lowered or access equipment is removed. Documentation Record the date of replacement, panel location within the display, part number used, and the name of the rigging contractor. Update the site asset register accordingly. When to Contact Aurora Signage Contact Aurora Signage support to confirm the correct replacement panel part number and to obtain any configuration files needed prior to scheduling rigging access. Early engagement avoids costly return visits.